Friday, 20 April 2012

Project cam time lapse videos and extra pics ...

Nick got the time lapse pictures working and has posted on you tube:

Movie 01 - Slab.
Aug 30 - Sept 11, 3 hr intervals. 0:27 mins.
Piles already in: clay board laid, steel work assembled, shuttering assembled, slab poured.

Movie 02 - Rammed earth wall mark 1.
Sep 14 - Sep 27. 3 hr then 1 hr intervals. 1:48 mins.
Glass foam base fitted, shuttering assembled, ramming, scaffolding assembled, more shuttering, more ramming, shuttering comes off, wall falls down, earth cleared.

Movie 03 - Rammed earth wall mark 2, SIPs construction.
Oct 14 - Nov 5, 1 hr then 30 min intervals. 3:04 mins.
REW2 shuttering & scaffolding in place, ramming of 1st 2.7 metres, scaffolding for SIPs assembled, REW2 pt 1 shuttering removed, ground floor SIPs and 1st storey floor and gable ends assembled, REW2 pt 2 shuttering and ramming.

Movie 04 - Cladding.
Jan 9 - Feb 9, 30 min intervals. 2:41 mins.
Breather membranes, battening, slate roof and western red cedar boards.

These are just some extra pics as it's been a couple of weeks since the last post.






Tuesday, 20 September 2011

Project Cam

Nick found a great project camera that we've put in the pear tree next to the play room.


Lovely picture of the slab shuttering ... check out Nick in the background putting up Project Cam.

And here's the view. It's programmed to take pictures between 8am and 5pm (when the builders have to stop work as a condition of our planning). We started out with it taking 1 shot every 3 hours but have upped this to every hour.



At some point we'll get them all loaded up to a flicker account, or set up a slide show or something. Will post the link when we do!