Thursday, 22 September 2011

Rammed earth wall - days 5&6

Nick managed to dislocate his finger at football!! What terrible timing. Luckily he gave it a pull and it went back into place almost straight away so it's a bit swollen, bruised and sore but he's able to move it about ok. He's fashioned a tube like splint and has managed to carry on shoveling and helping on site. No ramming or heavy lifting for the moment.

Yesterday went well. With Nick on light duties I was in the mix a bit more and got to man the rammer for a bit. It's not at all easy and takes quite a lot of muscle to maneuver it around although there's definitely a technique to it. We had a couple of breaks during the day to build up the shuttering.

Today I had to go into the office so missed out on the action. More breaks to sort shuttering and extend the lift and then re-gig the lift. We're finding these breaks eating into the ramming time so we haven't quite managed a metre on either day. Progress has felt a little slow but we are now over half way.


View from the top of the lift. You can see the two colours of earth we have behind the mixer.


Proof I've done my bit!


Nick on the mix. The earth has the right moisture content when you can squash it into a tennis ball sized blob and then when you drop it from hip height onto a hard surface it should break into several large pieces. Too dry disintegrates totally, too wet splats or doesn't break. 


Stelios sending up earth. The shuttering ends you can see here are 500mm short of the final height. This section now has sides and the earth lift has been extended up to the next level of scaffolding. 

Tuesday, 20 September 2011

Rammed earth wall - day 4

Nick, Stelios and I are staying at the hostel of mum and dad this week - thank you mum and dad. Stelios has joined Nick this evening for football.

This morning an 8am start, but only to supervise the scaffolding and lift set up. It all looks really impressive now. So ... a bit of hanging about and then work on the wall recommenced after lunch. Everything working really well.


Accidentally took B&W pics here! We have 2 different heaps of earth. 1 very yellowy from a new estate being built in north Cambridge (Orchard Park) and another quite brown earth from a new development just south of Cambridge (Trumpington) - the two are blended in the mixer and then water sprayed in until the moisture is just right. The mix is emptied into buckets and off it goes to the wall ...



Here's scaffolding and the bucket lift being fitted.

 Stelios ramming. We're must be a bit over 2 metres now - just 3 more to go. Final pic is looking down on the rammed earth:

Project Cam

Nick found a great project camera that we've put in the pear tree next to the play room.


Lovely picture of the slab shuttering ... check out Nick in the background putting up Project Cam.

And here's the view. It's programmed to take pictures between 8am and 5pm (when the builders have to stop work as a condition of our planning). We started out with it taking 1 shot every 3 hours but have upped this to every hour.



At some point we'll get them all loaded up to a flicker account, or set up a slide show or something. Will post the link when we do! 

From earth closet to earth wall ...

Title suggestion from Dora, my Great Aunt, who very kindly wrote us a bit about the history of the land and Reynolds Close. Here is her message, typed through the fug of a heavy cold. Thank you, Dora!

Dear Kate and Nick,

You asked about how Reynolds Close came to be, at any rate my recollections unfettered by reference to sources. But I am copying to Fabian for his comments additions, corrections etc. as he has a better memory than me.

1919 Dad back from german prison, got a post with Agricultural Research Council at their Cambridge center to improve, by his trainimng in genetics, the various breeds of cabbage (later changed to chickens). Married Mother in January and started looking for a house, preferably outside Cambridge and near the ARC farm. So Girton obviuos choice. Mr Hall, a local farmer offered a shack in strip where the entrance now is to Gretton Court. Parents weren't too struck with it, corrugated iron roof, one storey, three or four small rooms only. They looked over the hedge, saw a large field with view of Madingly ridge, a high boundary (?enclosure) hedge and four stately elms. Decided to buy and build.

Got gov't subsidy for small dwellings, Therefore two large army huts. First house in 50 years to be built in Girton. Very hot summer and Mother pregnant with Joanna kept seeking shade under elm trees, while Dad layed out the garden with Irvine King's help. Wedding present, possibly from one of the dons in the big houses at Girton Corner, of two wheelbarrowfuls of plants immensely helpful. Heavy clay as you know. All very different from Surrey, ?Hampshire( Bedales), and Germany, where Dad organised prison garden.

House extended in 1950s with annexe from  Mother's money. She had also bought cowfield inlate 1920's, so they had cows, goats, ducks and hens, two orchards. Mother was in charge of the dairy side. 

House called Reynolds Close, as tribute to Grandfather Edward Reynolds Pease. Wedgwood family suggestion of "the Pod" turned down..

Mr Hall put his stockman, Walter Mathews, wife Elizabeth, and two sons , Cyril and ?John, in the cottage rejected by parents. In 1950/60's Hall wanted to evict them, so Dad bought the strip to safeguard them, and ccreated a thid  orchard, once he had cleared out the very decrepit but yummily delicious greengage trees. Very soon the Matthews parents were given a council bungalow in the new St. Vincent Close, and and Dad was presented (?by Mother ) with a greenhouse, where he could grow tomatoes.

Dad died in 1966, and I think what with death duties, and wanting to run a smaller show, Mother and Bas ? and Joanna decidedto sell the Matthews' strip plus a chunk of Dad's garden and  the land between it and the stream to the founders of Gretton Court.

______________________________


Excerpts from subsequent messages between Dora and Fabian (her brother, my Great Uncle):


Fabian: Dora has given a far fuller account than I could have done and I have nothing to add. One minor cavil which is that the Playroom was not an army hut but was put together later (dunno when) and is of inferior quality than was the original army hut which had been a 'sick quarters' as Dad claimed that the medics always got the best huts.


Dora: I think the playroom was a hut of that period, but I agree the "Army Hut" was far superior. My understanding was that it had been the VD clinic which is how Dad got it cheap. The original Reynolds Close had an earth closet in the Army Hut which Dad (very ecologically minded) always used and Fabian and I were supposed to use during the day. The WC was upstairs and for Mother's use.

Rammed earth wall - day 3

Monday: Picked up Neil, met Michael on site 8ish so a bright early start. Stelios arrived late morning to complete the team and it was a good day's ramming with a break for the second level of shuttering to go up.


From left to right: Neil, Nick, Stelios and Michael. Hammering down one of the ribs. Michael brought all the kit for the shuttering pre-assembled - it's brilliantly built, all to within a millimeter and cleverly designed. There's a middle section that we should be able to remove to allow the floors to be finished right up to the wall - but leaving the rest of the wall covered whilst the house is fitted out preventing damage.

We built around a metre of height today, at which rate we think we'll finish in 5 or 6 days if no weather delays. Michael usually rams by hand and has worked out that the pneumatic ramming rod has made the ramming part of the process about 5 times faster.

Saturday, 17 September 2011

Rammed earth wall - day 2

Unfortunately I had to work. boo. Nick has recruited a friend, Neil, as a helper so there were 3 of them on site yesterday and it sounds like it went really well. The morning was spent getting systems up and running and the earth and water mix right. Wall building began in the afternoon and Nick says they are up to about 600mm now. We're going over later (apple crushing weekend) so i'll get to have a look.

Next week Michael is bringing a student of his who is keen for some earth wall experience along - Stelios. I'll get a picture of the full team and progress up Monday or Tuesday.

Thursday, 15 September 2011

A name!

Pease House is now official. We have paid our monies and the council are registering us as a new property. No number for now, just the name. We'll have to see how much of a problem that is for the post.

Pease is the name of my great grandparents who bought the cow's field at number 1 High Street in the early 1920s. They built the original part of the main house at number 1.  Dora (my great aunt, their daughter) has kindly offered to send me some history/memories of how it all came about - I will post when it arrives.